Scott Hupp
December 9th 03, 10:13 AM
I have configured backup to run three times per week. It
shows on the calendar but the backups do not run. There
is no event in the event log either starting or a failed
backup. Anyone run into this?
shows on the calendar but the backups do not run. There
is no event in the event log either starting or a failed
backup. Anyone run into this?